| Biomass - Energy Toolbox Renewable Energy Policy - Subsection 4 |
| Home: > Renewable Energy Policy > The CDM Process |
| The CDM Process Guidelines on the formulation of Project Design Documents can be downloaded from the UNFCC website and examples of previous prepared projects can be viewed. Each country that wants to support the CDM approach needs to designate a National Authority which has the authority to coordinate the agencies responsible for environmental management
Methodologies Key rules for the CDM Where is CDM applicable? Renewable energy Fuel switching (from fossil fuel to green fuel like biomass) Energy efficiency measures related to Waste management Transport Afforestation/ reforestation /Carbon sequestration A paper summarising the role of the CDM in Asia can be viewed here [PDF 261Kb]. Reference should be made to Annex 3 [PDF 118Kb] which provides a detailed analysis of the CDM process and the recent situation with respect to different methodologies. In addition examples of projects are provided to provide the reader with a better idea of the type of documentation that need to be put together. Additional References For afforestation/reforestation projects, reference should also be made to the following reports which provide an outline for an approved methodology and examples of worked proposals. Approved Methodology for A/R projects (China Proposal)
Examples of project documents for forestry projects within Belize and South America provide further examples: - Mountain Pine Ridge (Belize) Project document AES-Tiet Reservoirs Afforestation Project (Sao Paulo
State) Some of the issues facing Sri Lanka in developing a
portfolio of CDM projects is provided in the presentation given by KAK
Kasturiarachichi of the Global Affairs Division of the Ministry of Environment
and Natural Resources.
|
|
|
![]() |